Public seek wider service road at Lakshmi Nagar flyover

Public seek wider service road at Lakshmi Nagar flyover

Residents and traders want the proposed left-side service road at Lakshmi Nagar in Bhavani to be widened from 7 metres to 10.5 metres. Residents and traders have urged the National Highways Authority of India (NHAI) to widen the proposed left-side service road at Lakshmi Nagar in Bhavani from 7 metres to 10.5 metres to prevent traffic congestion and accidents.The Lakshmi Nagar junction on the Salem–Kochi National Highway 544 remains busy round the clock as vehicles from Erode and Perundurai cross the highway to enter Bhavani town. Similarly, vehicles from Bhavani town cross the highway to take the roads leading to Erode and Perundurai.The movement of long-distance buses, mofussil buses and town buses stopping at the Lakshmi Nagar bus stop adds to the congestion. Vehicles entering the highway from Bhavani disrupt traffic flow and frequently cause accidents. Chaos prevails at the junction throughout the day, making it a perennial problem that requires urgent attention, they said.Residents and traders have long been demanding a flyover at the junction to address the traffic problem. Responding to the demand, the NHAI has begun construction of a flyover at an estimated cost of ₹45 crore to ease congestion and improve road safety.Under the project, the left-side service road is proposed to be only seven metres wide. Traders and residents said the road served as a major link connecting Lakshmi Nagar with Erode, Bhavani and Mettur. A narrow service road could result in persistent traffic congestion and increase the risk of accidents.A delegation led by P. Vijayakumar, Erode Urban District president of the Tamil Maanila Congress (Moopanar), recently petitioned Srinivasalu, Chief Engineer of the NHAI’s Salem–Chengapalli Division, seeking the widening of the left-side service road to 10.5 metres, on a par with other link roads.They also urged the authorities to construct the starting point of the new left-side flyover parallel to the right-side flyover to prevent congestion at the Lakshmi Nagar entrance. The delegation requested that construction work in the area be suspended until a joint field inspection was held and the detailed project report revised. Published - November 20, 2026 06:13 pm IST

Original Source

Read the full article at Thehindu →

KhanList aggregates and links to publicly available news content. We do not host full articles from third-party sources. Always verify important information with original sources.