Risk assessment In an environmental assessment, released Wednesday, the Army said that trying to move the lead azide from its current position for any reason was ruled out. Any sloshing or physical shock from loading, transporting, or burying the barrels for safer detonation would create “an unacceptable safety risk and a high probability of accidental, uncontrolled detonation.” The military considered neutralizing the lead azide using a chemical reagent, but again ruled it out because it said the process would require handling the lead azide over an extended period, with barrels neutralized at a rate of 3 to 10 per day. “The chemical neutralization process requires significantly more ‘hands-on’ time and physical manipulation of the drums by personnel over a prolonged 7- to 22-day period, drastically increasing the probability of accidental, fatal detonation during handling,” the Army wrote in its assessment. In all, the Army considered a controlled, mitigated “Blow-in-Place” plan the best option, and it specifically planned for a fall detonation. The Army said the fall weather would “take advantage of periods of reduced thermal cycling and to ensure the lowest impact to facility operations and local agriculture (harvesting).” According to an emergency permit for the detonation from the Environmental Protection Agency, the plan is to place explosive charges and an accelerant on or near each of the ECMs. The Army intends to try to mitigate the detonation’s impact with a few simple methods. Those include lime-fill and sand-fill barriers around the ECMs, water cannons and misters to control lead dust in the wake of the explosion, and timing the detonation with ideal weather conditions—avoiding high winds that could increase the area exposed to the plume or, conversely, a thermal inversion that could trap the plume in one place. Toxic plume Modeling released Wednesday—based on the conditions for the scheduled detonation on Friday—suggested the plume could deposit lead dust at an amount of between 5 and 100 micrograms per square foot in a stretch up to 25 miles north, nearly to Wapello, Iowa. Those levels are above those considered hazardous for floors and windows, respectively. Meanwhile, Airborne lead, at a level of 0.18 micrograms per cubic meter, would reach nearly 100 miles north, toward Cedar Rapids, Iowa. The EPA standard for lead levels in the air is 0.15 micrograms per cubic meter.
Army delays detonating "catastrophically hazardous" lead azide amid fear, anger
Full Article
Original Source
Read the full article at Arstechnica →KhanList aggregates and links to publicly available news content. We do not host full articles from third-party sources. Always verify important information with original sources.