Victorian seaside resort DOUBLES size of beach using a million tonnes of shingle in £185m promenade makeover
A VICTORIAN seaside spot has doubled in size thanks to a £185 million promenade makeover. The beachfront has now reopened to visitors after six months of work. Southsea beach in Portsmouth is undergoing a huge redevelopment as work continues to increase the beach's size and improve the promenade flood defences. The Southsea Coastal Scheme is...
Original Source
Read the full article at Thesun →KhanList aggregates and links to publicly available news content. We do not host full articles from third-party sources. Always verify important information with original sources.