Puducherry seeks 50 MW additional power from central power grid
In a memorandum to the Union Minister, Namassivayam said the Union Territory has General Network Access to the Inter-State Transmission System for 540 MW of electricity. The territory’s requirements during peak hours in 2026-27 had reached 588 MW, thereby exceeding the available GNA by 48 MW during the current year, the memorandum stated
Original Source
Read the full article at Thehindu →KhanList aggregates and links to publicly available news content. We do not host full articles from third-party sources. Always verify important information with original sources.