Wellington Reporter·NZ Herald·14 Aug, 2026 05:00 PM2 mins to readPlans for the multibillion-dollar project include a long-debated second Mt Victoria Tunnel.Wellington’s $3.8 billion mega-highway project has been put forward for Fast-track consideration, despite the transport agency putting the unfunded project on ice until at least 2037. The State Highway 1 Wellington Improvements project, which includes a second Mt Victoria tunnel, a duplicate Terrace Tunnel and upgrades around the Basin Reserve,
NZTA lodges Fast-track application for Wellington’s SH1 mega-project and second Mt Victoria Tunnel
Full Article
Original Source
Read the full article at Nzherald →KhanList aggregates and links to publicly available news content. We do not host full articles from third-party sources. Always verify important information with original sources.