Ukraine’s Defense Forces struck the Crimean Bridge, a major infrastructure project and a symbol of Russian President Vladimir Putin’s rule, with Neptune coastal missile systems overnight on Thursday, Nov. 19, damaging its railway tracks, Ukraine’s General Staff said. “‘Neptune’ strikes a symbol: the railway tracks of the Kerch Bridge have been damaged,” the agency said in a statement on Telegram.JOIN US ON TELEGRAMFollow our coverage of the war on the @Kyivpost_official. According to the report, explosions were heard over the Kerch Strait during the night as Ukrainian Navy missile forces launched an attack using Neptune coastal missile systems. The General Staff said the target was hit, traffic across the bridge was halted and its railway tracks were damaged. The extent of the damage has not been independently verified. The General Staff described the bridge as the main land route through which the Russian army supplies its occupation forces in southern Ukraine with fuel, ammunition and military equipment. Russia built the crossing after illegally annexing Crimea in 2014 and has long presented it as a symbol of its control over the peninsula, repeatedly claiming it was “unreachable” and “invulnerable.” “The ‘Neptune’ has a history with such symbols,” the General Staff said, recalling the April 2022 strike that sank the Moskva, the flagship of Russia’s Black Sea Fleet. Other Topics of Interest Ukraine bypassed Starshield restrictions during its operation against the Crimean Bridge, using a network of “flying modems” to guide drones and missiles through Russian electronic warfare defenses. The Crimean Bridge is not the only crossing Ukraine says it has targeted as part of its efforts to disrupt Russian military logistics. The General Staff reported damage to the road surfaces of three other bridges used by Russian forces in recent days. On Nov. 15, bridges over the Siverskyi Donets River near Pryshyb in Ukraine’s occupied Luhansk region and the Mius River near Taganrog in Russia’s Rostov region were damaged. A day earlier, on Nov. 14, another bridge over the Mius Estuary near Lakedemonivka, also in Rostov region, sustained damage. “Every bridge rendered inoperable results in longer detours, traffic congestion at crossings, and delays for convoys carrying the ammunition and fuel awaited by the occupiers on the front line,” the General Staff said. The statement added that Ukraine’s Defense Forces were continuing to take measures to weaken Russia’s military and economic capabilities, invoking Ukraine’s right to self-defense under Article 51 of the UN Charter. As Kyiv Post reported erlier, Russia has suspended train traffic across the Crimean Bridge following another reported attack on the crossing on Thursday, marking the third consecutive day of reported strikes. Russia’s Transport Ministry said specialists were assessing the damage, while the Russian-installed head of occupied Crimea, Sergey Aksyonov, announced that traffic had been temporarily halted. Road traffic had already been disrupted following Tuesday’s attack, leaving both transport links affected. Ukrainian monitoring channels reported multiple impacts on the bridge, but the number of successful strikes and the extent of any additional damage could not immediately be independently verified. New strike follows destruction of 227-meter road section The latest reported attack follows a Ukrainian operation on Nov. 17, which President Volodymyr Zelensky confirmed had targeted both the road and railway sections of the bridge. The Security Service of Ukraine (SBU) said one of the bridge’s metal arches and the road span beneath it had been completely destroyed. Videos circulated online appeared to show a large section collapsing into the Kerch Strait. Kyiv Post previously reported that the attack brought down a 227-meter (745-foot) road arch. The Kremlin has pledged to rebuild and improve the crossing, but military analysts have questioned how quickly Russia can restore the heavily damaged structure. Some experts cited by Kyiv Post believe the scale of destruction could leave the bridge out of service for an extended period and require major reconstruction. The Crimean Bridge, approximately 19 kilometers (12 miles) long, connects mainland Russia with the Ukrainian peninsula Moscow illegally annexed in 2014. From sinking the Moskva to striking 1,000 kilometers away In November 2025, Zelensky released footage showing the launch of what he called “Long Neptunes” during an overnight operation against Russian targets on Nov. 14. It was the first time Kyiv had publicly shown the missile in action. “Ukrainian ‘Long Neptunes.’ Doing more,” Zelensky wrote on Telegram, describing the strikes as a response to continued Russian attacks. Ukraine had announced the missile’s extended capabilities earlier that year. In March 2025, Zelensky said the upgraded Neptune could reach targets up to 1,000 kilometers (621 miles) away. The original Neptune was developed as an anti-ship missile and gained international attention in April 2022, when a Ukrainian Neptune strike sank the Russian Black Sea Fleet flagship Moskva. However, the exact variant or configuration of the Neptune missile used in the latest attack has not been confirmed. Julia is a Deputy Head of News and correspondent for Kyiv Post who has previously worked as a parliamentary editor, journalist, and news editor. She has specialized in covering the work of the Ukrainian parliament, government, and law enforcement agencies.
‘Neptune’ Strikes Symbol’: Crimean Bridge Railway Tracks Damaged in New Strike
Full Article
Original Source
Read the full article at Kyivpost →KhanList aggregates and links to publicly available news content. We do not host full articles from third-party sources. Always verify important information with original sources.