Michigan flood watch: Evacuations begin in Alpena; wastewater system at capacity

Michigan flood watch: Evacuations begin in Alpena; wastewater system at capacity

All of the Upper Peninsula and half of the Lower Peninsula is under a flood watch as water neared the top of the Cheboygan dam and the Bellaire Dam was sandbagged.

Original Source

Read the full article at Bridgemi →

KhanList aggregates and links to publicly available news content. We do not host full articles from third-party sources. Always verify important information with original sources.