Lubec’s Safe Harbor project, including 625‑foot breakwater and boat ramp, to start July 1
The $27.5 million effort has been scaled back, dropping a planned breakwater road and hoists from the original design.
Original Source
Read the full article at Themainemonitor →KhanList aggregates and links to publicly available news content. We do not host full articles from third-party sources. Always verify important information with original sources.