Jamestown-Verrazzano Bridge work now done at night
Construction on the Jamestown-Verrazzano Bridge has moved to nighttime hours starting Sunday to alleviate traffic congestion during peak daytime travel times, following complaints about long delays. The Rhode Island Turnpike and Bridge Authority announced the change, scheduling work from 7 p.m. to 7 a.m. This shift aims to minimize disruptions for commuters and travelers, reflecting a response to public feedback. The move could significantly improve daily commutes and overall traffic flow on the bridge, which is a critical link between New York and Rhode Island.
Original Source
Read the full article at Rhodeislandcurrent →KhanList aggregates and links to publicly available news content. We do not host full articles from third-party sources. Always verify important information with original sources.