The successful launch of EOS-05 has given the Indian Space Research Organisation (Isro) more than just a new satellite in space. It has also set the stage for a busy period ahead for India's space programme.Speaking after the GSLV-F17 rocket successfully placed EOS-05 into its designated sub-geosynchronous transfer orbit on September 4, Isro Chairman V Narayanan outlined the work ahead.Isro has targeted six more launches during the current financial year, including the NVS-03 navigation satellite. Isro GSLV-F17 rocket carrying EOS-05 satellite lifts off. (Photo: PTI) At the same time, the agency is pushing ahead with the first uncrewed mission of the Gaganyaan programme, which is targeted for launch during 2026. “Reward for hard work is more work,” Narayanan said after the EOS-05 mission, noting that there is little time for the agency to pause.SIX MORE LAUNCHES AHEADNVS-03 will be part of India's NavIC navigation system, which provides positioning, navigation and timing services throughout India and the surrounding region. #WATCH | Sriharikota, Andhra Pradesh: On the successful launch of GSLV-F17/EOS-05 mission, ISRO Chief V Narayanan says, "We have got a historical achievement for the country. The GSLV-F17 vehicle has successfully placed the advanced Earth observation satellite 05 in the required pic.twitter.com/zJE4QGoPgv— ANI (@ANI) September 3, 2026Isro's annual report had earlier identified NVS-03 as the third satellite in the NVS series, designed to replace or strengthen the existing NavIC constellation.The announcement comes after a difficult start to the year for Isro. India's Navic launch is seen in the phase of preparation. (Photo: Isro) The January 12 PSLV-C62/EOS-N1 mission failed following an anomaly during the rocket's third-stage flight.EOS-05, therefore, became Isro's first successful orbital mission of the current financial year.EOS-05 itself marks an important milestone, with Isro describing it as India's first imaging satellite from geosynchronous orbit.From roughly 36,000 km above Earth, its position will allow it to maintain a broad and persistent view of areas of interest.GAGANYAAN: THE BIGGEST TESTThe most important mission ahead, however, is Gaganyaan.Narayanan said “vigorous, systematic work” is underway for the programme's first uncrewed mission, G1, with a launch targeted during this calendar year. Isro Chairman V Narayanan with astronaut and IAF Group Captain Shubhanshu Shukla. (Photo: PTI) G1 will carry no astronauts.Instead, it is designed to test the systems needed to eventually take humans to space and bring them safely back to Earth.Isro is already conducting extensive testing for the mission.In April, it successfully completed the second Integrated Air Drop Test, using a simulated crew module weighing about 5.7 tonnes.In July, it conducted the fifth Integrated Main Parachute Air Drop Test to further qualify the parachute system for G1.Gaganyaan's first uncrewed flight is one of three planned uncrewed missions, named G1, G2 and G3, that will precede the eventual crewed mission. Isro successfully conducted the Second Integrated Air Drop Test for Gaganyaan. (Photo: PTI) For Isro, the EOS-05 success is therefore less a finishing line than a fresh starting point.With six more launches targeted in the financial year and Gaganyaan preparations moving ahead, the pressure is now firmly on to turn a successful mission into a sustained run of launches.- EndsPublished On: Sep 4, 2026 12:10 IST
Isro chief reaffirms maiden Gaganyaan uncrewed launch by end of 2026
Full Article
Original Source
Read the full article at Indiatoday →KhanList aggregates and links to publicly available news content. We do not host full articles from third-party sources. Always verify important information with original sources.