Historic 900 MW reactor facility begins assembling 7,600-part nuclear core structures

Historic 900 MW reactor facility begins assembling 7,600-part nuclear core structures

French nuclear engineering firm Framatome has opened a new workshop in Le Creusot to build critical internal structures for nuclear reactors. The facility manufactures and assembles reactor pressure vessel internals. These complex mechanical frameworks hold and position nuclear fuel assemblies inside the reactor core. Because these structures directly govern reactor safety and thermal performance, engineers must assemble nearly 7,600 individual parts with extreme precision. Technicians can also remove the entire framework during routine maintenance outages. Production at the site began in July 2026 to supply six new EPR2 reactors planned for France. The first completed units are scheduled for delivery in 2032. Breakthrough in higher-enrichment commercial fuel The Le Creusot opening follows another major technical milestone for the company. In September, Framatome signed a commercial contract to supply nuclear fuel containing uranium-235 enriched above the standard 5 percent weight threshold. It marks the first time an active, full-scale commercial reactor will operate on this higher-grade fuel design. Most standard commercial reactors shut down every 18 months to replace spent fuel rods. Because the new fuel holds a higher concentration of fissile uranium, reactors can generate heat for longer periods before requiring fresh supplies. With this, plant operators get a chance to extend a reactor’s operating cycles to 24 months and reduce costly refueling outages. Higher enrichment also unlocks higher fuel burnup limits. In nuclear engineering, burnup measures how much thermal energy operators extract from a set amount of heavy metal. A higher burnup rate lets a reactor generate more electricity from each fuel assembly, producing less nuclear waste per megawatt-hour. Ensuring full traceability for every component To house the new production line, Framatome invested nearly €100m ($110m) to overhaul 15,000 square meters of industrial space and create around 50 jobs. Engineers equipped the plant with large-scale machining, welding, and assembly systems. The plant also features digital monitoring systems. This ensures full traceability for every component during manufacturing. The facility maintains a minimal carbon footprint by using geothermal energy to regulate workshop temperatures. Inside, two dedicated training zones also qualify staff in specialized welding and machining techniques required for Framatome’s operations in the Burgundy region. “The building additionally houses two dedicated areas for training in welding and machining, in order to ensure the training and qualification of skills required for Framatome’s manufacturing activities in Burgundy,” highlighted the company. Framatome chose Le Creusot to capitalize on decades of local experience in high-precision nuclear manufacturing. The move also keeps strategic production capabilities inside France. The modernized workshop occupies a historic industrial building that originally opened on 2 November 1973 to produce components for France’s second-generation 900 MW reactor fleet. “The inauguration of this workshop marks a major step in strengthening our industrial capability,” concluded Grégoire Ponchon, Framatome’s chief executive. “By developing this strategic capacity in Le Creusot, we are consolidating the autonomy of the French and European nuclear sector, while meeting our customers’ needs in a context of global nuclear revival.”Get the latest in engineering, tech, space & science - delivered daily to your inbox.An active and versatile journalist and news editor. He has covered regular and breaking news for several leading publications and news media, including The Hindu, Economic Times, Tomorrow Makers, and many more. Aman holds expertise in politics, travel, and tech news, especially in AI, advanced algorithms, and blockchain, with a strong curiosity about all things that fall under science and tech.

Original Source

Read the full article at Interestingengineering →

KhanList aggregates and links to publicly available news content. We do not host full articles from third-party sources. Always verify important information with original sources.