GVMC’s BT Pothole Doctor draws swift, widespread public demand

GVMC’s BT Pothole Doctor draws swift, widespread public demand

GVMC’s BT Pothole Doctor repairing road at Assilmetta in Visakhapatnam. | Photo Credit: FILE PICTURE The Greater Visakhapatnam Municipal Corporation’s (GVMC) initiative “BT Pothole Doctor,” also known as the “Pothole Busters Road Doctor,” is drawing a good response from the public, with residents increasingly approaching the civic body to get potholes repaired in their respective localities. An advanced road repair machine, which can complete a pothole repair in just 10 to 15 minutes, has emerged as a swift solution to address road damage across the city.Since its maiden use in the first week of September 2026, the advanced road repair machine has been deployed in several parts of the city, carrying out patchwork at multiple locations. Its services were also extensively utilised to improve road conditions ahead of the recently held CII Partnership Summit.The machine has now become a familiar sight on the city roads. A vehicle carrying the equipment, bituminous mixture, gravel, and other materials reaches the identified location along with a team of workers. The machinery is then put into operation, the pothole is cleaned, filled with the required bituminous mixture, and levelled using a mechanised process. The stretch is temporarily barricaded to facilitate the work and ensure the safety of road users.The speed at which the repairs are being undertaken has caught the attention of residents. Several people have reportedly been approaching GVMC through social media platforms and the Command and Control Centre (CCC), seeking the deployment of the machine in their colonies and neighbourhoods to address potholes that have been causing inconvenience to commuters.In response to the growing demand, the GVMC is deploying the machine zone-wise, drawing up schedules based on complaints and the urgency of the repairs. On Tuesday (November 17), the Pothole Doctor carried out repair works in the Gajuwaka zone and is scheduled to move to the Pendurthi zone on Wednesday (November 18).Superintending Engineer (Mechanical Wing) Royal Babu said the time taken for each repair usually depended on the size of the pothole, but it generally ranged between 15 to 20 minutes. The machine could undertake patchwork at approximately 10 to 15 locations a day, he added.Explaining the process, he said the machine was equipped to clean potholes, fill them with the required bituminous mixture and complete the patchwork on the spot. It was being deployed across all GVMC zones according to local requirements, he added.GVMC had procured the advanced machine at an estimated cost of ₹1.30 crore to facilitate speedy and quality repairs of potholes on major roads as well as interior roads across the city. The civic body has prepared an action plan for its zone-wise deployment, giving priority to major roads, stretches with heavy vehicular movement, and locations requiring urgent repairs. Published - November 17, 2026 06:34 pm IST

Original Source

Read the full article at Thehindu →

KhanList aggregates and links to publicly available news content. We do not host full articles from third-party sources. Always verify important information with original sources.