The first calibration flight on the second runway at Phu Quoc International Airport was completed successfully on July 27 despite heavy rain and reduced visibility, marking a key milestone in the airport's expansion project ahead of APEC 2027. Vo Huu Tri, Head of the Phu Quoc Air Traffic Control Tower, said Phu Quoc Island frequently experiences rapidly changing weather during the rainy season, including thunderstorms and poor visibility.The commissioning of the new Instrument Landing System/Distance Measuring Equipment (ILS/DME), together with the upgraded approach lighting and runway lighting systems, will significantly enhance operational safety at Phu Quoc International Airport, he said. A new aircraft parking space at the expanded Phu Quoc International Airport. Photo by Anh Duong The calibration flight was carried out as scheduled using a Beechcraft B300 King Air 350ER aircraft registered in the Czech Republic and operated by a joint Vietnamese-Czech flight crew.The aircraft conducted a series of approaches to Runway 28R to inspect and calibrate the ILS/DME, approach lighting system and Precision Approach Path Indicator (PAPI), ensuring that all equipment meets the standards of the International Civil Aviation Organisation (ICAO).According to the project developer, the first flight departed at 6:23 a.m. and landed at 9:56 p.m., while the second sortie took place from 1:06 p.m. to 3:29 p.m. During the flights, engineers performed multiple approach procedures and circular flight patterns around the runway threshold to verify the accuracy, integrity and reliability of the navigation and visual guidance systems. The first calibration flight on Phu Quoc International Airport's second runway. Video by Anh Phu, Cong KhangThe successful calibration came just eight months after construction began on the new runway, which is 3,300 meters long and 45 meters wide. The facility is equipped with a modern lighting system that is being deployed for the first time at an airport in Vietnam, according to the contractor.The technical upgrades are expected to pave the way for round-the-clock operations, helping the airport accommodate rising passenger numbers and flight frequencies as Phu Quoc is preparing for the year-end tourism peak and the APEC Economic Leaders' Week in 2027.The second runway is a key component of the government-approved expansion of Phu Quoc International Airport.Built to ICAO Code E standards, it is capable of regularly handling wide-body aircraft such as the Boeing 787, Airbus A350 and Boeing 777, as well as accommodating larger Code F aircraft when required.The expanded airport is expected to play a vital role in welcoming leaders, delegates and international visitors from 21 APEC member economies during the APEC Economic Leaders' Week in 2027.
First calibration flight successfully completed on Phu Quoc airport's new runway
Full Article
Original Source
Read the full article at E →KhanList aggregates and links to publicly available news content. We do not host full articles from third-party sources. Always verify important information with original sources.